What goes wrong

A limit is expressed as a share of something else - a percentage, a fraction of a budget, a per-part allowance - while the quantity it must cover is an absolute amount that does not scale with it. The number looks safe because it is large in its own basis, and nobody restates it in the units of the thing it has to absorb.

Example

A reserve set to ten percent of a budget is meant to absorb one extra step, but on the smallest budget ten percent is less than a single step costs.

Not to be confused with

Not Quantity written in wrong unit: both sides here carry the same unit, and the fault is the reference the bound is measured against rather than a missing conversion.

Discovered by

Field notes · 9